Urban composition based on 100x80 m housing block
Water infrastructure for resilience and flood protection
Green corridors and connections based on the city analysis
Combined blue-green infrastructure with new urban fabric
New urban zoning for the area, with mixed use public spaces
Final masterplan of the New City (tram line marked in red)