Heba mohamed's profile

PRECAST PROJECT- SECURITY BUILDING-(PLOT-01)

                      SECURITY BUILDING-PlOT-01
                            King Abdullah bin Abd al-Aziz project a third
                                                extension of the holy haram Makkah.
            Contractor: PREMCO- Sudi binladien group.
                   Location:   Saudi Arabia-Riyadh 
                   Role:          Shop drawing for GRC screen.
                   Year:           2015
                   Tools:         AutoCAD 
                                           Elevation.
                                       GRC shop drawing.
                                                     GRC shop drawing.
                                                 GRC shop drawing. 
                                Connection details 
PRECAST PROJECT- SECURITY BUILDING-(PLOT-01)
Published:

Owner

PRECAST PROJECT- SECURITY BUILDING-(PLOT-01)

Published:

Tools

Creative Fields